Portal de Moratalla

www.portaldemoratalla.com

Moratalla - SpanishMoratalla - English
detail of Moratalla

 

The Ministry of Public Works improving road safety Highway Benizar with the expansion of the platform and replacement of the pavement (22/07/2015)

The Director of Roads, Jose Antonio Fernandez Lladó, inaugurated the expansion works of the platform and reposition the firm made in the RM-B30 road, which connects the hamlet of Benizar (Moratalla) with the vial of Socovos today, "involving a significant improvement in road safety for users and local residents. "

Llado Fernandez stressed that the road has experienced "a major refurbishment with the widening of the platform in the section under the action, with a length of three kilometers, as well as expanding and improving drainage, improving signage and marking and the paving of the road. "

The Director of Roads had an impact on performance "solves a historical demand of citizens and especially the residents of Benizar, Otos and Mazuza, districts that maintain a strong relationship with the town of Moratalla, on which they depend, causing heavy traffic of vehicles on this stretch. "

The main action of this draft overall improvement of the road, which had a budget of almost 374,000 euros, has been widening platform, which has equipped the two-lane meters wide and berms to 0, 5 meters.

Thus, the paved platform has widened to 7 meters.

To do this, we have proceeded to the execution of all the earthworks necessary cuttings and embankments, for the formation of the platform with the width obtained, and the formation of a base layer of strong final, forming with it the ultimate platform on which it is implanted the new pavement.

In addition, the renovation has made three works included extension of existing water step and two-step implementation of new water, allowing more efficiently permeate the road.

Also, there have been various salvacunetas steps to allow access to the adjoining plots.

For paving the platform they have been used 4,450 tons of hot asphalt mix, giving it a strong modern, comfortable and safe.

The work is complete with painted 10,176 for the axes and longitudinal edges with road markings, the replacement of existing barrier 120 meters linear meters and 320 meters placing metal guardrail on roadsides 41 and vertical signals.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Regi?n de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información